SAMPLE FIELD REPORT

Silage corn — 2026 season

Area
171 decares (17.1 ha) · 4 adjoining parcels
Checkpoints
4 / 8 completed
Risk flag
At 3 checkpoints
Farmer average
7.4 / 10

CP-0

Soil Preparation / Pre-sowing

Before sowing

Verified

Risk flag

  • Weeds (URGENT): A single herbicide application was not enough and weeds are not under control. As the crop develops the application window narrows, so a second application is the priority.
  • Starter nitrogen: 25 kg/decare of 13-15-10 compound fertiliser was applied as base dressing, which equals roughly 3.25 kg of pure nitrogen per decare. This is low for the nitrogen demand of silage corn; most of the requirement will need to be met with split top-dressing applications.

Structured findings

Seedbed
Poor
Soil moisture
Insufficient
Drainage
Good
Soil analysis (pH, N, P, K, EC)
Sampled, results pending

Agronomist's recommendation

The inspection identified several findings that may affect production potential. Some stem from soil preparation and cannot be reversed; a significant share, however, can still be corrected with timely intervention. • Seedbed and rooting: Clods were not broken down enough, leaving some seeds suspended and rooting weak. Some areas show 10–15% emergence gaps. • Weeds (URGENT): A second herbicide application is the priority. • Starter nitrogen: A split top-dressing programme should be planned. • Irrigation: Signs of stress were observed; because of late sowing, continuous water supply during flowering will be critical.

CP-1

Sowing

Sowing day (T0)

Verified

Risk flag

  • On the coarse-clod parcels (P3–P4), seed-to-soil contact may be poor; a risk of emergence gaps and uneven stands is expected.
  • Because germination was started by sowing into dry soil and then irrigating, keeping the topsoil moist until emergence is critical; the irrigation schedule should be monitored closely.
  • Starter nitrogen is low; top-dressing should be planned as split applications.

Structured findings

Hybrid / FAO group
650
Seeding rate
9,000 seeds/decare
Row spacing
70 cm
In-row spacing
15 cm
Sowing depth
5 cm
Base fertiliser
13-15-10, 25 kg/decare

Agronomist's recommendation

1. Parcels P1 (62 decares) and P2 (45 decares) received full tillage and the clods were broken down well. On P3 (42 decares) and P4 (22 decares), an equipment failure meant the mixer could not be run; only ripping and harrowing were done, so the clods remained coarse. 2. 25 kg/decare of 13-15-10 was used as base fertiliser, leaving 3.25 kg/decare of pure nitrogen in the soil. This is a low start for corn, so top-dressing is critical for crop health. This is a controlled comparison: same block, same inputs, with soil preparation as the only variable. The two groups will be tracked side by side at the following checkpoints.

CP-2 · VE-V2

Emergence

10 days after sowing

Verified

Risk flag

  • Inadequate weed control
  • Signs of nutrient/nitrogen deficiency

Structured findings

Emergence rate
80%
Uniformity
Good
Plants/m²
9
Gap rate
60%

Agronomist's recommendation

Recommended application for all parcels, mixed into the drip irrigation: • 2 kg urea phosphate • 5 kg Timazot (drip) • 2 L active humic acid The new parcels need phosphorus + nitrogen + organic matter; on the existing parcels, nitrogen is the main need. Find and fix the cause of the clogged drippers. Apply herbicide to the new parcels.

Farmer scoreOverall 7.8/10

Communication
9/10
Efficiency
6/10
Correct use of inputs
6/10
Timeliness
10/10

CP-3 · V3-V6

Early Vegetative / Crop Care

28 days after sowing

Verified

Structured findings

Height
75 cm
Colour / N status
Good
Weed pressure
Moderate
Top-dressing
13-15-10 compound, 25 kg/decare
Pests observed
No

Agronomist's recommendation

Recommended application for all parcels, mixed into the drip irrigation: • 2 kg urea phosphate • 5 kg Timazot (drip) • 2 L active humic acid The new parcels need phosphorus + nitrogen + organic matter; on the existing parcels, nitrogen is the main need.

Farmer scoreOverall 7.0/10

Communication
8/10
Efficiency
5/10
Correct use of inputs
5/10
Timeliness
10/10

The season is in progress: the remaining 4 checkpoints will be completed by harvest. Payments are released in two tranches, tied to the pre-harvest maturity and delivery inspections.

Get these reports for your own crop

In a short call, we will walk you through how the system works, using your crop as the example.

Book a call